top of page
hyde street pier.jpg

Hyde Street Harbor Water Side Facility San Francisco, CA

Phase one we provided preliminary design and study for bilge water collection and sewage collection system, connection to existing oil water separator and pump out system. Phase two consisted of detail design and construction support of all items in phase one which consists of providing water, power and lighting to each berth, parking lot lighting, drainage system and pump station. Fire protection provided at each berth.

Hyde Street Harbor Water Side Facility: Welcome
bottom of page