NBA Engineering designed the HVAC Systems as well as electrical systems for Potrero Switching Station. HVAC areas included 115/230 KV GIS rooms, cable vault, battery room, and 115/230 kV relay rooms. NBA reviewed project design criteria and drawings.  Performed cooling load and ventilation calculations, generated specifications, and selected equipment.  NBA developed HVAC equipment arrangement and duct layout drawings.  Coordinated with other disciplines to resolve interface problems.  Responded to client reviews and comments.  Participated City Building Department review and resolved fire safety issues. NBA’s electrical scope was the design of single line diagrams for Transformer Bank #5 and Bank #6. Design of building interior lighting and associated controls per California Title 24 requirements. Design of power plans for receptacles and connections of HVAC/mechanical equipment. Performed load calculations for AC & DC panels. Prepared lighting fixture schedule. Prepared electrical specifications.
HVAC and Electrical Systems Design for Potrero Switching Station- San Francisco, CA